Reorder Point and Safety Stock Calculator
Safety stock and reorder points fail in two directions: too little buffer and the shelf empties before the truck arrives, too much and cash sits in the stockroom. This calculator works from your own demand and lead time, in both a quick average mode and a paste your history mode, and returns the three figures Business Central wants: Safety Stock Quantity, Reorder Point, and Reorder Quantity, the planning parameters on the item card and stock keeping unit.
Measure lead time from purchase order date to shelf date; a guessed lead time gives a confident wrong answer.
How the Math Works
Safety stock = Z x sqrt( L x daily variance + average daily sales squared x lead time variance ), where L is lead time in days and Z comes from the service level you pick. When lead time does not vary, that reduces to Z x daily standard deviation x sqrt(L). Reorder point = average daily sales x lead time + safety stock. Suggested order quantity = reorder point + average daily sales x days between orders, minus stock on hand, and never below zero. Safety stock, reorder point, and order quantity are rounded up to whole units. In paste history mode the standard deviation is the sample standard deviation, using the n minus 1 denominator, because a month of sales is a sample of demand, not all of it.