Vendor-managed inventory: letting the supplier drive your replenishment
Vendor-managed inventory inverts the replenishment relationship: instead of your buyers raising orders, the supplier monitors your sales and stock and ships against agreed parameters. Done well it removes a whole class of ordering labour and puts the forecasting burden on the party who sees the widest market. Done loosely it hands your shelf space and your cash conversion to someone whose incentives, more of their product, in more of your stores, sooner, are adjacent to yours but not identical.
The data you owe the arrangement
VMI runs on your data exhaust: daily sales by item and store, current stock positions, and inbound visibility. In an LS Central estate that data flows by replication and scheduled extracts, and its quality becomes contractual, a supplier replenishing against a stock figure corrupted by unposted statements will make confidently wrong orders. Agree the data set, the cadence, and the known lags in writing, and treat a data-quality problem as a VMI incident, not an IT footnote: the supplier's planner is, functionally, a member of your replenishment team who works from another building.
Guardrails: the parameters are the contract
- Min/max by item and store, set or approved by you, reviewed seasonally, the supplier optimises inside them, never beyond.
- A maximum weeks-of-cover ceiling per category, so "availability" cannot be bought with your working capital past the agreed point.
- Assortment authority stays yours. The supplier proposes new lines and delistings with evidence; ranging decisions are minuted as yours.
- Promotional volumes are flagged, not extrapolated. A promotion's spike marked as such in the data, with the uplift planned jointly, or the algorithm will refill the spike as if it were demand.
Accountability: fill rate with a definition
The service measure needs the same precision as any scorecard: availability of the VMI range on the shelf (not in the building), measured by your audit method, against a target, with the remedy ladder agreed, review, corrective plan, step-in rights to order directly, termination. Also agree who owns the tail: when a VMI line dies, the run-out is whose stock risk? The commonest VMI dispute is the exit stock of a delisted line the supplier ranged optimistically; answer it in the agreement, in the good times, in one sentence.
The buyer's new job
The pilot discipline: two categories, one season, honest measures
VMI should never start chain-wide. Pilot it on two categories with opposite shapes, one steady staple range, one seasonal, for a full season, with the measures agreed before the first supplier-raised order lands: on-shelf availability, weeks of cover, your team's hours spent (the arrangement's actual labour saving, counted rather than assumed), and exception volume. Run your own shadow replenishment calculation for the first month only, in parallel, to calibrate trust: where the supplier's orders and your shadow agree, confidence is earned; where they diverge, the divergence is the training data for the parameter conversation. At season's end the decision writes itself from the four measures, and, just as important, the exit rehearsal has effectively happened, because a pilot that measured everything can be ended without archaeology. The chains that regret VMI are the ones that signed it as a philosophy; the ones that keep it signed it as an experiment that kept passing.
What VMI does to your promotions calendar
The arrangement's stiffest test is the promotion. A promoted VMI line can multiply its rate of sale several-fold for a fortnight, and the supplier's model, trained on your ordinary trading, will either chase the spike into an overstock or ignore it into a stock-out unless the uplift is planned as a shared input: the forecast uplift by store group, the display quantities, the exit expectation, agreed in the promotional planning meeting and recorded as an overlay on the parameters, not as a hopeful email. After the event, the overlay is removed on a date, and the post-promotion dip is read together so neither party's model learns the wrong lesson from the other's silence. Chains that run VMI well treat the promotions calendar as a joint document with named owners on both sides; chains that run it badly discover, one promotion at a time, that an automated supply chain automates the consequences of uncommunicated plans at exactly the same speed.
VMI does not remove your buyer; it promotes them from order-clerk to contract manager. Their calendar becomes: parameter reviews, exception reports (the orders the system refused or the cover the ceiling blocked), promotional planning with the supplier, and the quarterly business review where the availability and stock-turn figures are read together. Stores that skip this discover the arrangement's drift a season late, in the stock figure. Keep one of your own replenishment analysts reading the VMI categories' data as if you still ordered them, because on the day the agreement ends, you do, and the exit terms should include the data and parameter history you will need to resume.
, Dex Carter, Tech Writer