← All guides

Scheduled KPI Packs: The Monday-Morning Email Set for Store Managers

Reporting & analytics · 6 min read · By Dex Carter · Published 2026-10-26 · Last updated 2026-10-26

Ring binder of tabbed report pages on a store manager's desk with coffee, a radio handset and keys by a window
The Monday pack, opened at the same point in the routine every week.

A scheduled report in Business Central does not arrive in a store manager's email inbox. It lands in the Report Inbox on the Role Centre. That one fact decides whether a Monday-morning KPI pack works: design the pack around the Report Inbox as the destination, and scheduling becomes a reliable routine; design it around email that the scheduling feature never promised, and the pack quietly fails while everyone blames the managers for not reading it.

Teardown: what "scheduled" actually delivers

Strip the feature down to its documented parts:

Nothing in that chain is an email step. The pack design below accepts the chain as it is.

Pick the numbers a store manager can act on Monday morning

A KPI pack is a design problem before it is a scheduling problem. The test for every candidate report is the same: can the manager do something about this number before Wednesday? Apply it as a framework, report by report:

Five is a discipline, not a magic number: a pack a manager can finish before the first customer beats a pack of fifteen that gets opened on Thursday. Any report that fails the act-by-Wednesday test belongs in a monthly pack, not this one.

One scheduled entry per report: filters frozen at setup

There is no pack object and no per-store bursting in the documented scheduling flow. A pack is a set of separate scheduled entries that happen to share a time slot, and the request-page options entered at scheduling time are the options applied at execution. The store filter a manager's pack needs is therefore set once, per entry, at setup, and it does not adapt itself later.

Pack elementHow it is builtConsequence
Each report in the pack Its own scheduled entry via Send to > Schedule Reports can be added, dropped or re-timed individually without touching the rest of the pack
Each store's pack A separate set of entries, with that store's filter set on each report's request page at scheduling time Store count multiplies entry count, three stores with five reports each is fifteen entries to keep consistent
The Monday slot The recurrence set on the Schedule a Report page: Description, Report Output Type, Next Run Date Formula (CM, for example, means current month), Earliest Start Date/Time and Expiration Date/Time A weekday recurrence is a date formula like Thursday's D4 pattern, pick the formula that lands the pack before the managers' Monday start, and check the first run date it produces

Build one store's pack completely, verify it for two Mondays, then clone the pattern store by store. Cloning an unverified pack multiplies the defect, not the benefit.

The Report Inbox habit: making managers actually open the pack

Since the destination is the Report Inbox on the Role Centre, the pack needs a human routine wrapped around it:

  1. Agree the slot: the pack is read at a fixed point in the Monday routine, before the floor walk, with the week's numbers still changeable.
  2. The manager opens the Report Inbox and works the pack top to bottom; the reports were scheduled to finish before that slot, so a missing report is a scheduling fault, not a reading fault.
  3. One response is expected per pack, the action taken on the leak and the shelf numbers, so an unopened pack shows up as a missing response, not as a silent inbox.

What success looks like: by mid-Monday, every store's response exists, and it references numbers that match the reports in that store's Report Inbox.

Email expectations vs the documented delivery

The request usually arrives as "email the managers their numbers." The documented scheduling flow delivers to the Report Inbox, full stop. Treating email as the pack's delivery channel means building the routine on a step the scheduler does not perform, and the failure mode is silent: the reports run, the inbox fills, nobody is notified, and the pack is declared dead by week three.

So the decision is explicit. Either the Report Inbox is the channel, with the Monday habit above doing the work a notification would do, or email delivery is scoped, set up and verified as a separate piece of work before the pack is promised to anyone. What never works is assuming the scheduled report emails itself.

Verify the pack ran: job queue status before blaming the manager

When a manager says the pack never arrived, check in this order:

  1. Open Job Queue Entries and find the report's entry. Remember that a one-time entry is removed after execution, a missing one-time entry can mean it ran, not that it vanished.
  2. Check the recurring entry's status and next run. To change a recurring entry's parameters, put the entry On Hold before editing, then choose Set Status to Ready to resume it, an entry left on hold runs nothing.
  3. Check the Report Inbox for the finished output. The report may have run correctly to a destination the manager did not open.
  4. Check the request-page options frozen on the entry: a pack filtered to the wrong store ran perfectly, for the wrong store.

What success looks like: every pack entry shows its next run in the coming week, the Report Inbox holds this week's output for each store, and the filters on each entry name the store the pack belongs to.

, Dex Carter, Tech Writer

IndexBack to all guides →