Every replenishment argument eventually becomes an argument about one number: the suggested quantity on a journal line. A buyer who cannot re-derive that number by hand has to either trust it blindly or override it blindly, and both habits are expensive. The good news is that for Average Usage items, the whole calculation hangs off one formula, and the mysterious part, stock cover, is just a number of days built from a small set of fields. This guide does the arithmetic slowly, then runs one item through it twice: once with Lead Time Calculation off, once with it on.

Scope, deliberately narrow: this is the cover-days and lead-time arithmetic only. The wider replenishment picture, calculation types, journals, the end-to-end decision chain, is covered in the replenishment planning basics guide, and reorder points and maximums have their own setup guide.

The one formula everything hangs off

For Average Usage, the system suggests:

System Suggested Quantity = Average Daily Sales × Required Stock Cover Days × Forward Sales Forecast Factor − Effective Inventory

Three of the four inputs deserve a sentence each. Average Daily Sale is calculated from Item Ledger Entries under the item's Sales Profile as −Quantity / (No. of Days − No. of Out of Stock Days), out-of-stock days are removed from the divisor, so an item that was unavailable for half the period is not punished with a halved sales rate, corrected by Sales History Adjustments and weighted across Sales Profile lines. Effective Inventory is on hand plus quantity on purchase order, minus purchase returns, minus quantity on sales order, plus transfer in, minus transfer out, plus assembly header, minus assembly line, and which document types count at all is configured in the Effective Inventory FastTab of Replen. Setup. The Forward Sales Forecast Factor is a simple ratio, Total Post Period Sale / Total Pre Period Sale, from the Forward Sales Profile; a factor of 1.0 means the coming period is expected to sell like the reference period.

Two guard rails apply to the result: a suggested quantity below zero is set to zero, and if Effective Inventory is greater than or equal to the calculated suggestion, the suggestion is set to zero. The system would rather suggest nothing than a negative order.

Where Required Stock Cover Days actually comes from

Cover days answer the question: "for how many days of selling must this delivery provide stock?" There are two ways the number is produced.

With a Coverage Days Profile, cover is calculated dynamically from the replenishment calendar:

Store Stock Cover Days = No. of Days until Next Calculation Day + Inbound Store Handling Time + Coverage Buffer Days − Store Closing Days

(the warehouse version substitutes Inbound Whse. Handling Time). Cover therefore breathes with the schedule: a Monday calculation that only has to last until Wednesday produces fewer cover days than the Wednesday calculation that must last until the following Monday.

Without a profile, cover is a flat field: Store Stock Cover Reqd. (Days) for a store, Wareh Stock Cover Reqd. (Days) for a warehouse. And when replenishing a warehouse, the system resolves the source in a fixed fallback order. Wareh Coverage Days Profile, then Wareh Stock Cover Reqd. (Days), then the Store Coverage Days Profile, then Store Stock Cover Reqd. (Days). When a journal line's cover looks wrong, this chain is the checklist: the value came from the first of those four that was filled in.

Lead Time Calculation: the coverage period moves

By default, the formula quietly assumes the ordered stock is available for the whole coverage period. Real stock is not, it arrives after the vendor's or the warehouse's lead time. Lead Time Calculation, switched on per item on the Replenishment Control Data page (and available for Average Usage and Manual Estimate items), fixes the timeline: the Stock Coverage Period is shifted to start a day after the stock arrives. The gap before it is the Lead Time Coverage Period, and its length, the Lead Time Cover Days, is built from the lead time plus handling:

ScenarioLead Time Cover Days
Purchase to warehouseVendor Lead Time + Inbound Whse. Handling Time
Purchase to storeVendor Lead Time + Inbound Store Handling Time
Transfer to storeSourcing Location Lead Time + Inbound Store Handling Time
Purchase to warehouse with cross dockingVendor Lead Time + Inbound Whse. Cross Dock Handling Time + Sourcing Location Lead Time + Inbound Store Handling Time

Without a Coverage Days Profile, the Lead Time Cover Days are simply the Vendor Lead Time (purchase) or Sourcing Location Lead Time (transfer). The lead times themselves live in ordinary places: Vendor Lead Time on the Retail Vendor Card or per item in the Item Vendor Catalog, with an Item Vendor Dest. Locations override when a vendor is slower to one destination than another, and Sourcing Location Lead Time on the Store card's Customer Order Sourcing Locations.

The documentation's calendar example shows the shift concretely: a store open Monday to Saturday, calculations on Monday and Wednesday, vendor lead time 2 days, inbound handling 1 day, buffer 2 days. Monday's run has a 3-day lead time, stock arriving Thursday, and a stock cover of 3 days; Wednesday's run also has a 3-day lead time, but because the next calculation is further away, its cover is 6 days. Same item, same vendor, different cover, purely from where the runs sit in the week.

Projected Effective Inventory, in plain terms

With Lead Time Calculation enabled, the formula stops subtracting today's Effective Inventory and subtracts a forecast of it instead:

Projected Effective Inventory = Effective Inventory − Lead Time Sales Quantity, where Lead Time Sales Quantity = Lead Time Cover Days × Average Daily Sales (Manual Estimate items use their Manual Estimated Daily Sales).

In plain terms: "by the day this delivery lands, we will have sold roughly this much of what we currently count as available, so judge the need against what will be left, not what is here now." One safety detail: if the projection goes negative, it is adjusted to zero, unless the Replenishment Template's Allow Negative Projected Eff. Inventory setting is enabled, in which case it stays negative and inflates the suggestion accordingly. If Effective Inventory was already negative before the projection, the projected value keeps that negative value regardless of the setting.

A balance scale weighing two different stacks of boxes, with a ruled sheet and pencil beside it
The reverse check weighs the same shelf both ways: if the quantity cannot be zero, the inputs are wrong, not the formula.

One item, calculated both ways

Take an item selling an average of 4 units a day, Forward Sales Forecast Factor 1.0, Required Stock Cover Days 7, Effective Inventory 10, and a vendor lead time (with handling) of 3 days:

StepLead Time Calculation OFFLead Time Calculation ON
Demand for the cover period4 × 7 × 1.0 = 284 × 7 × 1.0 = 28
Lead Time Sales Quantity, (not calculated)3 days × 4 = 12
Inventory subtractedEffective Inventory = 10Projected Effective Inventory = 10 − 12 = −2 → adjusted to 0
System Suggested Quantity28 − 10 = 1828 − 0 = 28

The ten-unit difference is not the system being generous. With lead time off, the formula orders 18 and implicitly spends the current 10 during the three days the delivery is in transit, the shelf empties before the truck arrives if sales run at the average. With lead time on, the suggestion covers the full cover period because the stock on hand is honestly assigned to the lead-time window. Verify the reverse case too: with Effective Inventory 40, the projection is 40 − 12 = 28, and the suggestion is 28 − 28 = 0, lead time calculation does not manufacture orders when stock is genuinely deep; it only stops the transit window from being counted twice.

One adjustment sits downstream of both modes: if Planned Sales Demand records fall inside the cover period, the demand quantity is rebuilt as Average Daily Sale × (Required Stock Cover Days − No. of Planned Sales Demand Days) + Total Planned Sales Demand Quantity, and the suggestion is calculated from that demand instead. An event week is therefore not a reason to distrust the formula, it is an input to it.

When to enable Lead Time Calculation: a decision framework

What success looks like

Pick any journal line and reproduce it on paper: Average Daily Sale from the Sales Profile math, cover days traced to either the Coverage Days Profile components or the correct fallback field, the Forward Sales Forecast Factor from its two period totals, Effective Inventory rebuilt document type by document type, and, for lead-time items, Lead Time Sales Quantity and the projected figure. If your hand calculation lands on the journal's number, the setup is understood, not merely working. That is the point where overriding a suggestion becomes a decision instead of a guess.

FAQ

Why did the same item get different cover days on Monday and Wednesday?
Because with a Coverage Days Profile, cover is built from the days until the next calculation day plus handling and buffer, minus closing days. A run that must last until a near calculation needs less cover than a run bridging a longer gap, the documentation's own example gives 3 days on Monday and 6 on Wednesday for the same store and vendor.

Does Lead Time Calculation change Average Daily Sales?
No. It changes what is subtracted (Projected instead of Effective Inventory) and when the coverage period starts. The sales rate itself is calculated the same way; it is also the rate used to estimate Lead Time Sales Quantity.

The suggested quantity is zero but the shelf looks low. Why?
Work the formula: if Effective Inventory, which includes quantity on purchase order and transfer in, is greater than or equal to the cover-period demand, the suggestion is set to zero by rule. Stock already on its way counts, even when it is not yet on the shelf.