← All guides

Adjusting item costs after posting in Business Central: Adjust Cost vs revaluation

Inventory & replenishment · 8 min read · By Dex Carter · Published 2026-10-24

Flat illustration of a desk with a ledger, a calculator, a stack of receipts and one receipt with a red tag
A posted cost with the wrong number is one receipt in the stack: find it before you adjust anything.

The vendor invoice arrives at a different price than the receipt was posted at. Or someone keyed the wrong unit cost on a positive adjustment. Or head office decides a line of stock is worth less than the books say. All three get described as “the cost is wrong”, and all three are fixed with different tools. Business Central will not let you edit a posted entry, by design: the correction is always a new entry that adjusts the old one. Choosing the wrong correction tool is how a simple fix turns into a valuation that is wrong in a new and more interesting way.

First, name the mistake: three wrong-cost causes, three different fixes

CauseWhat actually happenedCorrect tool
Late or corrected vendor costReceipt posted at expected cost; the real invoice differsPost the invoice, then run Adjust Cost, Item Entries to forward the real cost
Wrong cost keyed at receipt or on a journalThe inbound entry itself carries a cost that was never realAdjust Cost first; then the Revaluation Journal against the affected entry if a specific value must be set
Deliberate value changeStock is worth more or less than its posted cost (damage, obsolescence, market move)Revaluation Journal, this is the only cause it exists for

The logic underneath the table: Adjust Cost, Item Entries does not invent values. As Microsoft’s documentation puts it, the cost adjustment process only processes value entries that are not yet adjusted, and where changed inbound costs need to be forwarded to related outbound entries, it creates new adjustment value entries carrying that difference. It propagates real, posted costs, nothing more. The Revaluation Journal is the opposite: it sets a value by decision. Microsoft’s revaluation page is blunt about the division, to appreciate or depreciate an item or a specific item ledger entry, you must use the revaluation journal. Practitioner answers on the Dynamics Community land in the same place: consumed positive adjustments cannot sensibly be reversed, and the advised sequence is to run Adjust Cost first, then revalue.

Step zero: run Adjust Cost, Item Entries before touching anything

Whatever the cause, run cost adjustment first. Until it runs, the item’s entries may not yet carry the true inbound cost, and revaluing on top of un-adjusted entries revalues the wrong number. The batch job calculates the value of each inbound transaction and forwards that cost to the outbound transactions, sales and consumptions, applied against it, creating adjustment value entries (plus rounding entries) as it goes. Run it manually by searching Adjust Cost, Item Entries, specifying the item or items, and choosing OK; or make the whole question smaller by enabling Automatic Cost Adjustment on Inventory Setup so adjustment happens at posting time for the affected item, with the batch job run regularly. Microsoft recommends as often as possible, during nonworking hours, to catch the rest. The Inventory Cost Adjustment page shows each item’s costing parameters and adjustment status, which is where to confirm the run actually processed the item in question.

One timing rule matters before anything posts: adjustment entries take the posting date of the original value entry, unless that date falls in a closed inventory period, in which case they take the first date of the next open period (or, where inventory periods are not used, the Allow Posting From date on General Ledger Setup). A correction aimed at last month may legitimately land this month, and knowing that in advance prevents a confused month-end.

Flat illustration of hands holding a box over a scale beside a clipboard with blank checkboxes and a calculator
The revaluation procedure works from the physical item outward: weigh, check, then post the correction.

The revaluation procedure, step by step

  1. Run Adjust Cost, Item Entries for the item (above) and confirm on the Inventory Cost Adjustment page that its status is adjusted.
  2. Open the Revaluation Journal: search Revaluation Journal and choose the related link.
  3. Choose Calculate Inventory Value and fill in the request page, item, location, and the posting date the revaluation should be calculated for, then OK. The journal fills with lines per item ledger entry.
  4. Check the scope before editing: confirm the lines shown are the entries intended, one specific receipt, or every entry for the item, and delete lines that should not change value.
  5. Enter the new value: on each line, enter the new unit cost in Unit Cost (Revalued), or the new total in Inventory Value (Revalued). The Amount field shows the resulting change in inventory value, the difference between Inventory Value (Calculated) and Inventory Value (Revalued), which is the number finance will ask about.
  6. Review the total Amount across all lines against the expected correction. A revaluation that moves value by ten times the intended amount is almost always a per-unit vs total field mix-up; catch it here, not in the G/L.
  7. Post. New value entries are created reflecting the revaluation, and the new values are visible on the item card.
  8. Run Post Inventory Cost to G/L (or confirm automatic cost posting is on) so the adjusted inventory value reaches the general ledger, then re-check the item’s unit cost and inventory valuation against the intended figures.

What success looks like: the item card shows the corrected unit cost, the item’s value entries include the revaluation entry for exactly the intended amount, and the inventory valuation report agrees with the G/L inventory account after Post Inventory Cost to G/L runs.

What revaluation cannot reach, and what to do instead

The limit that surprises people: the revaluable quantity is the remaining inventory on the calculation date, per Microsoft’s design details, the sum of completely invoiced item ledger entries posted on or before the revaluation date. Three consequences follow. Stock received but not yet invoiced is generally outside the calculation (Standard-cost items are the exception, their not-completely-invoiced entries are included). Quantity already sold is not sitting in inventory to be revalued; however, a revaluation can be backdated, and a backdated revaluation is the documented way to correctly update cost of goods sold for items already sold. And a posting made later with a date before the revaluation is not swept into it, only the original revaluable quantity is considered. In practice: correct uninvoiced receipts at the invoice, not in the journal; use backdating deliberately when sold quantity’s COGS must move; and never assume a revaluation silently covers stragglers posted afterwards.

Retail timing: statements, period close, and the G/L follow-through

In an LS Central estate the inventory being corrected is also being consumed by POS sales all day, which adds two timing disciplines. First, run the correction when the affected stores’ statements for the period are understood: cost adjustments change the value of outbound entries, so a correction landed mid-close shifts the numbers a statement review is trying to freeze, sequence it before the close work starts or after it finishes, and say which in the close notes. Second, remember the closed-period rule above: once the inventory period is closed, the adjustment posts into the next open period, so a “fix March’s margin” request made in April produces an April entry, correct behaviour, but it belongs in the explanation to whoever reads the monthly margin report. Finally, test the whole sequence in a sandbox first when the amounts are material; the Dynamics Community answers on exactly this scenario repeat that advice for a reason, revaluation is easy to post and tedious to unwind.

FAQ

Can’t the original entry just be edited or deleted? No. Posted entries are the audit record. Every correction here is a new value entry that adjusts the original, which is why the trail from mistake to fix stays visible.

Adjust Cost ran but the unit cost did not change. Why? Adjust Cost only forwards costs that exist in posted entries. If no corrected inbound cost has been posted, the vendor invoice is still unposted, for example, there is nothing to forward. Post the source document first, then re-run.

Should revaluation be used to fix a keying error? Only after Adjust Cost has run, and only when a specific value must be set on a specific entry, the pattern practitioners recommend for consumed opening balances. If the real cost exists in a posted document, let Adjust Cost propagate it instead of typing a number.

Does changing the Unit Cost field on the item card fix history? No. The item card cost drives future postings; posted history changes only through adjustment and revaluation entries.

General information about Business Central inventory costing, not accounting or professional advice. Costing behaviour varies by costing method and version, and material revaluations should be agreed with the finance team and tested in a sandbox before posting.

IndexBack to all guides →