← All guides

The Hotel Go-Live Checklist: Migrating Future Reservations and Deposits

Hospitality · 6 min read · By Dex Carter · Published 2026-10-26 · Last updated 2026-10-26

Go-live is not a data load. That is the misconception to clear first. Loading future reservations into LS Central is the easy part to describe and the easiest part to get wrong in practice, because a reservation is not just a name, a date, and a room. It carries money: a deposit already collected, a deposit still due, and a schedule that tells the property what the guest still owes.

If that schedule arrives broken, the reservation looks loaded and the money is wrong.

No single source retrieved for this topic covers the whole move. A generic property-system migration checklist covers the verification discipline, and LS Central help covers the deposit machinery. The procedure below joins those two, and it should be read that way, as a working checklist built for the migration, not as a vendor-published migration guide.

What actually migrates: three things, not one

Split the load into three objects and prove each one separately. First, the future reservations themselves. Second, the deposit schedule attached to each reservation, the lines that say what is due, when, and whether it has been paid. Third, money already collected, which has to land somewhere it can later be consumed against a folio rather than sitting as a vague opening balance.

Treating those as one import hides the failures. A reservation can be present while its schedule is missing. A deposit can be recorded while its assignment is not. Each object gets its own check below.

Deposits in LS Central: policy, schedule, entries, assignment

Start with the trigger. When a Deposit Policy is assigned to a Rate Code, LS Central automatically generates a deposit schedule for reservations created with that rate. The rate code on a migrated reservation is therefore not decoration. Put the wrong rate on the reservation, or leave the policy off the right rate, and the schedule the guest is measured against will not be the schedule the property intended.

Deposit schedule lines carry a specific set of fields. Check migrated lines against that set, field by field:

Schedule fieldWhy it matters at migration
Due DateShows when each deposit amount falls due
Deposit CodeIdentifies which deposit rule produced the line
Deposit % or Fixed AmountThe basis for the amount, a percentage or a fixed sum
Payment Date and Paid flagSeparates money already collected from money still owed
POS Transaction No.Recorded for the payment, and for any refund

One lifecycle rule shapes the whole timing. Changes to a reservation update its deposit schedule only until the reservation is set to In House; at that point deposits are expected to have been collected. A migrated reservation that is already in house on day one has no schedule-updating window left, so its deposit position has to be right at load time, not fixed later.

Collected money has a second home. Deposit Assignment assigns a reservation deposit to folios so it can be consumed in a folio payment transaction. The documented example splits a 500 deposit with 300 assigned to a beverages folio. The assignment page tracks Total Collected Deposit, Total Unassigned, and, per folio, the assigned Amount, Consumed, and Balance. Auto-Assign distributes the collected deposit between folios.

Short version: schedule says what is owed, assignment says where collected money will be spent.

Deposits can also be collected and managed without the policy and schedule setup. That option matters for exceptions found during migration, but it is not a reason to load the bulk of reservations without the policy that should generate their schedules.

The migration procedure: load, spot-check, reconcile

  1. Set up the rate codes first. Confirm each Rate Code that should carry deposits has its Deposit Policy assigned before reservations are created with that rate, because the policy is what generates the schedule.
  2. Load the future reservations. Bring every future booking across, including bookings whose deposits are partly collected or partly due, those mid-lifecycle reservations are the ones the schedule and assignment checks exist for.
  3. Spot-check at least 10 bookings. Open individual reservations and compare guest, dates, rate, and deposit position against the old system. Ten is the minimum verification standard in the generic migration checklist; it is a floor, not a sample size to defend.
  4. Check schedule lines on the spot-checked bookings. For each one, confirm Due Date, Deposit Code, Deposit % or Fixed Amount, Payment Date, and the Paid flag read as expected, and that any paid line carries its POS Transaction No.
  5. Check collected deposits against assignment. Where a deposit has been collected, confirm Total Collected and Total Unassigned on the assignment page, and that amounts assigned to folios plus the unassigned remainder account for the collected total.
  6. Test rate plans with sample stays. Run sample stays for rack, corporate, weekend, and package rate plans and confirm each produces the deposit behaviour its policy should produce.
  7. Run the reconciliation in the next section. Do not proceed to cutover on spot-checks alone.

What success looks like: at least 10 bookings spot-checked clean, schedule lines complete on those bookings, collected deposits fully accounted for between assigned and unassigned amounts, and sample stays on the four rate-plan types generating the expected schedules.

The reconciliation: the total has to agree

Spot-checks prove individual bookings. The reconciliation proves the money.

Take the deposit total in LS Central after the load and agree it with the old system's deposit total. The generic checklist standard is strict: deposits matched to bookings, with the deposit total agreeing with the old system. Not close. Agreeing.

ResultDecision
Totals agree, spot-checks cleanProceed to cutover planning
Totals differ, difference traced to named reservationsFix those reservations, reload or correct the schedules, reconcile again
Totals differ, difference unexplainedNo-go. A difference nobody can name becomes a guest dispute after arrival
Schedules missing on rates that carry a policyNo-go until the Rate Code policy setup is corrected and the schedules generate

That table is the decision framework for the whole article. Everything else is preparation for being able to fill in its first row honestly.

Cutover day: night audit, channels, and the first check-in

Sequence the day around three tests the generic checklist names. Run the night audit once on test data before it has to run for real. Connect the OTA channels and receive a test reservation from each channel, one per channel, not one channel standing in for the rest. Test the rate plans with sample stays if that step was not already closed during the load.

Keep the old system readable after go-live. Readable means staff can look up a booking and a deposit position in the system the guest originally booked in, while the new system's records are still earning trust.

Agree the rollback plan in advance, with a trigger people can recognise under pressure. The example in the generic checklist is plain: return to the old system within 24 hours if check-in or payments do not work. A property can set a different trigger, but it should be written down before cutover, not negotiated during a failed check-in queue.

Go / no-go checklist

General information only, not accounting or implementation advice. Adapt the reconciliation and rollback decisions to your property's own policy and partner guidance.

, Dex Carter, Tech Writer