Go-Live Hypercare: The First Week's Checks, Escalations, and Exit Criteria
When does hypercare end, when the calendar says so, or when the stores prove they are stable? That is the only question week one has to answer, and the two answers lead to very different first weeks. A calendar-based hypercare runs support for a fixed period and stops. An evidence-based hypercare runs daily checks, logs every issue with an owner, and ends only when transaction stability, reconciliation results, and user confidence say it can. This guide runs the two approaches head to head for an LS Central go-live, and lands on the evidence side, with the daily retail checks that produce that evidence.
Hypercare or just hope? What week one must prove
Hypercare, in the sources behind this guide, is not a mood. It is a set of measurable habits: support available around the clock, a daily standup, incident tracking that records root cause and resolution time, user feedback gathered from every department, and key performance indicators tracked against the baselines recorded before the new system went live (s2). If none of those habits exists, the project does not have hypercare, it has hope with a meeting invite.
The retail version of that list starts one level lower, at the transactions themselves. The workflows that carry the most risk, order imports, purchasing, receiving, inventory adjustments, transfers, fulfilment, invoicing, ecommerce sync, and financial posting, need monitoring, and critical transactions need frequent reconciliation, daily in the earliest period (s1). In a store estate, that principle lands on three daily questions: did yesterday's trading post cleanly, is replication between store and head office current, and do the tender totals agree with what the tills recorded? Those three checks are this guide's original adaptation of the sourced daily-reconciliation rule to LS Central's statement and replication mechanics, they are the retail form of "reconcile critical transactions daily," not a separate claim about the product.
Calendar vs evidence: the two exits, side by side
| Decision point | Calendar-based hypercare | Evidence-based hypercare |
|---|---|---|
| When it ends | On a pre-set date, typically when two weeks have passed | When the exit evidence below is met, reviewed on a set review date |
| Transaction stability | Assumed once the date arrives | Checked: high-risk workflows monitored, critical transactions reconciled daily in the earliest period |
| Issue volume | Not a formal input | A named exit factor, read from the shared issue log |
| Integration reliability | Assumed | A named exit factor, sync and replication behaviour is evidence, not anecdote |
| Reconciliation results | Not a formal input | A named exit factor, alongside transaction stability |
| Support demand and user confidence | Not measured | Both named exit factors, fed by feedback from every department |
The right-hand column is not this guide's invention. The exit factors, transaction stability, issue volume, integration reliability, reconciliation results, support demand, and user confidence, are the operational evidence one source names explicitly, with the warning that hypercare should not end simply because two weeks have passed (s1). The calendar still has one job: it sets the review date on which the owners look at the evidence and agree the exit, or extend support with a reason.
The daily checks: money, stock, and sync before anything else
Run the checks in the same order every morning, before the standup, so the standup discusses results instead of guesses. Money first: confirm the previous day's statements posted and validate the financial reports they feed, validating financial reports is part of the stability focus the sources set for the first 90 days (s4). Stock second: verify inventory accuracy, the other half of that same stability focus (s4), which in a store means the adjustments, receiving, and transfers recorded yesterday match the physical story the store tells. Sync third: work the high-risk workflow list, order imports, purchasing, receiving, inventory adjustments, transfers, fulfilment, invoicing, ecommerce sync, financial posting, and confirm nothing is sitting unprocessed between systems (s1).
Every failed check becomes an entry in the issue log the same morning. A check that cannot be run at all, no report, no access, no owner, is itself an incident, because a blind day produces no exit evidence.
The issue log: severity, owner, next action
The log is the system that keeps week one sane, and its rules are simple. Triage every issue by its effect on business work, what can the store no longer do, not by who reported it loudest. Record each issue in a shared log with an owner, a status, and a next action (s3). Add the incident-tracking fields the hypercare sources name: root cause and resolution time (s2). Severity follows from the triage rule: an issue that stops trading or posting outranks one that slows a back-office task, which outranks a cosmetic complaint, and the owner named on the line owns the next action, not just the update.
One separation matters from day one. Improvement requests, the "could it also do this" items, get documented separately from production incidents (s4). Mixing them inflates the incident count, hides the real stability signal, and turns the exit review into an argument about scope instead of evidence.
Escalations: who decides, how fast, on what evidence
Escalation is a decision path, not a louder email. Each severity level in the log needs a named owner who can decide, fix now, apply a workaround, or accept and defer, and the evidence they decide on is the log itself: effect on business work, root cause once known, and resolution time so far (s3, s2). The daily standup is where escalations surface: support demand, new issues, and ageing issues reviewed once a day, every day, while hypercare runs (s2). Between standups, the rule is that a trading-stopping issue does not wait for the next meeting, it goes straight to its named owner, because the 24/7 support commitment in the hypercare model exists for exactly that case (s2).
Store confidence: workarounds are data too
The softest exit factor, user confidence, has a hard signal hidden inside it: workarounds. Staff who keep a shadow spreadsheet beside the new system are signalling a training gap or a workflow gap, and the sources name exactly that pattern as something to watch for (s3). Treat every workaround found in week one as data. Log it, classify it, training, workflow design, or genuine system issue, and fix the cause. A store that trades confidently on the system, with feedback coming from every department rather than silence from most of them (s2), is producing exit evidence. A quiet store running parallel spreadsheets is not stable; it is unsupported in a way the incident count will never show.
Exit criteria: leave hypercare on evidence
Exit when the evidence column is green, reviewed with the owners on the agreed review date: transaction stability demonstrated over consecutive reconciled days, issue volume and support demand trending down in the log, integration reliability shown by current replication and clean sync, reconciliation results clean, and user confidence supported by department feedback rather than workarounds (s1, s2, s3). The wider stability focus does not end at exit, the first 90 days keep daily monitoring of critical transactions, financial-report validation, and inventory-accuracy checks at the centre (s4), but the intensive hypercare posture, with its daily standup and around-the-clock cover, steps down to normal support once the evidence says the estate is stable.
First-week hypercare checklist
- Before go-live, record the pre-system KPI baselines hypercare will be judged against, and confirm 24/7 support cover and the daily standup are scheduled (s2).
- Each morning, run the daily checks in order: statements posted and financial reports validated, inventory accuracy verified, and the high-risk workflows, order imports, purchasing, receiving, inventory adjustments, transfers, fulfilment, invoicing, ecommerce sync, financial posting, confirmed current (s4, s1).
- Log every failed check and every reported issue in the shared log with severity by effect on business work, a named owner, status, and next action (s3).
- Track root cause and resolution time on every incident, and file improvement requests in a separate list from production incidents (s2, s4).
- Hold the daily standup on the log: new issues, ageing issues, escalations, and support demand (s2).
- Sweep for workarounds, shadow spreadsheets and side processes, and log each one as a training or workflow signal (s3).
- Collect user feedback from every department, not only the loudest one (s2).
- At the review date, score the exit evidence, transaction stability, issue volume, integration reliability, reconciliation results, support demand, user confidence, and agree the exit or the extension with the owners (s1).
What success looks like: every morning's checks are run and recorded, every issue in the log has an owner and a next action, no workaround is running unlogged, and the exit decision, whenever it lands, points to reconciled days and a falling issue count in the log, not to a date on the project plan.