← All guides

Copying a Company for Testing: What Comes Across and What Doesn't

Administration & Upgrades · 4 min read · By Dex Carter · Published 2026-10-26 · Last updated 2026-10-26

A solid blue and yellow storefront beside an identical storefront drawn only as a dashed outline
The copy looks like the original, the outline is where the differences hide.

The new company sits in the Companies list with an unmistakable name — TEST — and opens to the same items, the same customers, the same setup as production. That sameness is the point: on the Companies page, the Copy action creates a second company based on the contents of an existing company, which Microsoft documents as a way to test a company without disrupting production data. But the copy is not a perfect clone. Microsoft strips specific things on purpose, the notes about them are scattered, and a few behaviours are not documented at all. This article assembles the inventory.

What comes across: the working assumption

Start from the documented definition: the new company is based on the contents of the existing one. For testing that means the working assumption is production-like data and setup — treat everything in the copy as live-looking until a check below says otherwise. That assumption is what makes the exceptions matter: the differences between the copy and production are exactly the places a test can silently mislead you, or a “test” action can reach further than intended.

What Microsoft strips on purpose

The exceptions live as separate notes in Microsoft’s company guidance rather than in one list. Assembled, and checked against the mirrored guidance, they are:

ItemState in the copyWhat to do
SMTP email account passwordNot included in the copyRe-enter it on the SMTP Account page in the new company if the copy must send mail
Dataverse / Dynamics Sales connection settingsCleared during the copyReconnect deliberately, and only to a non-production target
Integration recordsCleared during the copyDo not treat missing integration history as a test result
Integration synchronisation jobsCleared during the copyRecreate only the jobs the test actually needs
Synchronisation errorsCleared during the copyA clean sync-error list in the copy proves nothing about production
Users, permission assignments, scheduled workNot stated in the retrieved Microsoft guidanceVerify in the copy itself (checklist below) before anyone tests in it

Read the pattern, not just the rows. Everything stripped belongs to connections pointing out of the company — email credentials and integration state. Microsoft’s design makes the copy inward-looking by default: it cannot send mail until the password is re-entered, and it cannot synchronise until the connections are rebuilt. The risk is not what the copy lacks; it is what a tester restores without thinking.

The isolation pass: before the first test

Run these checks in the copy before testing starts. They take minutes, and they convert the undocumented rows above from assumptions into observations.

  1. Confirm the SMTP state. Open the SMTP Account page in the copy. The password should be absent, exactly as documented. If the test needs email, re-enter a password only for a test mailbox — the moment a real account is configured, the copy can send real-looking mail to real addresses from production data.
  2. Check the integration setup pages. Connection settings, integration records, and synchronisation jobs are cleared during the copy. Confirm they are empty, and agree as a team which ones, if any, get rebuilt — and against which sandbox endpoints.
  3. Review who can sign in. The retrieved guidance does not state whether users and permission assignments carry across. Open the users list in the copy and check it directly; remove or restrict anyone who does not need test access.
  4. Review scheduled work in the copy. Scheduled work is likewise not covered by the retrieved guidance. Look at what is set to run in the copy and pause anything that is not part of the test.
  5. Treat the data as real. Customer and vendor records in the copy are copies of real records. Handle exports and screenshots from the test company with the same care as production extracts.

What success looks like: the copy cannot send email or synchronise anywhere until someone deliberately configures it, the sign-in list has been seen with human eyes, and every behaviour the team relies on during testing has been observed in the copy rather than assumed from production.

Copy is not a backup: picking the right route

Microsoft is explicit on one point that test planning keeps blurring: do not use Copy as a backup. To take a backup, export the database as a .bacpac file. The two routes answer different questions:

GoalRouteWhy
Test changes against production-like data, in the same environmentCompanies > CopyCreates the second company from the existing company’s contents, without disrupting production
Create a restorable backup pointDatabase export (.bacpac)The documented backup route; Copy is not one
“We copied it, so we have a backup”Neither — a misconceptionA working company you can edit and delete in is not a restorable copy of the database

The copy earns its keep as a test bed: production-shaped, deliberately disconnected, and verified item by item before the first test runs. Set it up in that order and the sameness that makes it dangerous becomes the thing that makes it useful.

, Dex Carter, Tech Writer