Business Central Release Wave Planning for Retail: The Two Waves a Year, Mapped

Administration & Upgrades · 6 min read · By Dex Carter · Published 2026-10-26 · Last updated 2026-10-26

Business Central ships two major release waves a year: release wave 1 in April and release wave 2 in October, with minor updates released monthly in between. That is the whole rhythm a retail chain has to plan around. Two fixed points, a steady drip of small updates, and, for wave 2, a preview month in September before general availability in October. Put those dates on a retail calendar and the planning problem mostly solves itself: test before each wave, schedule the wave itself away from your busiest trading weeks, and never let a monthly minor surprise you.

Wave 1: the April wave

Wave 1 reaches general availability in April. Microsoft describes the release wave as a six-month cycle that groups new, changed, and planned features for a half-year period, so an April wave is not a single day of change, it is the start of a half-year in which that version line keeps moving through monthly minors.

The 2026 wave 1 line shows the pattern in version numbers. After the April major release, minor updates 28.2, 28.3, and 28.4 followed in June, July, and August 2026, and update 28.5 arrived in September 2026. A chain that plans only for April and then stops watching will miss five months of smaller change landing on the same version line.

For retail, wave 1 is the friendlier of the two. April sits outside the peak trading season for most chains, so the sensible calendar treats the weeks before April as the test season for wave 1: extensions checked, core till flows rehearsed in a sandbox, and staff-facing changes noted before the wave arrives.

Wave 2: the October wave

Wave 2 reaches general availability in October. For 2026, that is version 29: update 29.0 is the October 2026 release, and it was available for preview in September, the month before general availability.

That September preview is the most useful planning gift in the wave 2 cycle. A chain can spend September testing against the incoming major version instead of discovering changes in October. The alternative, first contact with a major update in the same quarter as the busiest trading weeks of the year, is a self-inflicted problem.

So run the two waves differently. Wave 1: test in the run-up to April, schedule promptly, move on. Wave 2: treat September preview as the test season, and be deliberate about when in the autumn the production move happens. A chain that trades hardest in November and December should not drift into a major-version change in those weeks if it has any scheduling choice at all.

Point of comparisonWave 1Wave 2
General availabilityAprilOctober
2026 version lineVersion 28 (28.5 minor in September 2026)Version 29 (update 29.0, October 2026)
Preview monthCheck the roadmap for the current cycleSeptember 2026, before October general availability
Between-wave rhythmMinor updates released monthly (for example 28.2 to 28.4 in June, August 2026)
Retail planning postureTest before April; schedule earlyTest in the September preview; schedule deliberately before peak trading

The planning habit Microsoft retired

One part of the old routine is gone. Microsoft is replacing the release plans with the AI at Work roadmap, so bookmarks and internal planning pages that pointed at release-plan documents now point at a retired format. The twice-yearly fixed planning point that the release plans provided goes with them.

The replacement habit is a standing review rhythm, monthly or quarterly, built on the roadmap and Message Center instead of a document published twice a year. Set it up once:

  1. Open the AI at Work roadmap and filter the view by product, so the chain watches Business Central rather than the whole Microsoft catalogue.
  2. Subscribe to the filtered roadmap view via RSS, so changes arrive without anyone remembering to go looking.
  3. Keep using Message Center alongside the roadmap for tenant-specific changes, the roadmap is the forward view, Message Center is where your own tenant gets named.
  4. Update internal links and bookmarks that pointed at the old release plans, and tell whoever owns the planning calendar where the new source lives.
  5. Put a recurring monthly or quarterly review on the calendar: scan the roadmap, note anything heading for the next wave or the next minors, and log decisions while there is still time to act on them.

What success looks like: the chain hears about an incoming change from its own review rhythm. RSS item read, Message Center checked, decision logged, not from an update notification or a till behaving differently on a Saturday morning.

Adding the LS Central layer to the same calendar

LS Central does not need a second planning calendar. It needs slots inside this one.

Reserve time in each wave window for the LS layer: hotfix notes reviewed after each wave and after significant minors, POS-facing changes flagged to store operations, and any partner work booked into the same test season as the Business Central testing. One calendar, two product layers, no separate LS surprise season.

Keep the minor-update rhythm in the same view. Monthly minors are small, but they are also monthly, the quarterly review in the procedure above is the backstop that catches anything the RSS feed and Message Center did not surface.

The chain's wave calendar, month by month

MonthCalendar action
JanuaryConfirm current BC and LS Central versions per environment; check the roadmap review is live.
FebruaryRoadmap review focused on wave 1; list extension and till-flow checks to run.
MarchFinal test month before wave 1: sandbox testing of core retail flows.
AprilWave 1 general availability. Schedule the production move deliberately; verify the first trading days.
May, AugustMonthly minors land (the 28.2 to 28.4 pattern in 2026). Quarterly roadmap review; hotfix notes skimmed.
SeptemberWave 2 preview month (2026). Test season for the October wave.
OctoberWave 2 general availability (29.0 in 2026). Schedule before peak trading where choice exists.
November, DecemberChange freeze posture for peak trading: minors monitored, no discretionary major moves.

The decision rule underneath the calendar is simple. Spend testing time in the preview and run-up months, spend scheduling choice early rather than late, and let the monthly review rhythm, not a retired release-plan document, tell you what is coming next.

Dates and version details above reflect Microsoft's published cycle as of October 2026; check the roadmap for the current cycle before booking partner time.

, Dex Carter, Tech Writer